1.2008 Passed ISO9001:2008
2. 2011 Got the certification of Tianjin Small and medium technology enterprise
3. October 2013,Anka company moved to Tianjin beichen technical zone(state class technical zone)
from xiaodian industrial zone of beichen, Tianjin
4.Dec. 2013,Foreign investment company changed to private company
5. June 2014,Obtained the national special project approval。
6. In 2014, the company received a subsidy of 300,000 yuan for headrest project, and the
government provided an interest-free loan of 400,000 yuan
7. Oct. 2014,Start to transfer Ts16949 system
8. At the begging of 2015, anka began to prepare for the certification of TS16949. In May 2015,
onsite audit was conducted and passed
9. Sep.24,2015 Listed on tianjin new third board, received 1.8 million yuan of government
subsidies (600,000 yuan of actual subsidies)
10. Feb. 2015 applyed for provincial high-tech enterprises
11. Jun.2016 Obtained the tianjin patent pilot unit
12. Oct. 2016 obtained provincial high-tech enterprises, and at the same time the national
high-tech enterprises declaration
13. Nov. 2016 applied for 5 inventions and 6 utility model patents
14. March 2017 Upgrade the equipment and introduce 4 Engel high speed injection molding
machines (injection speed 1000)
15. May 2017 Anka company to carry out environmental transformation, equipment upgrade
16. Dec.2017 Anka company obtained the national high-tech enterprise certificate
17. Dec.20,2017 Through environmental assessment, anka company fully implements the
requirements of environmental impact assessment report, strictly implements relevant environmental
protection laws and regulations, improves the environmental management ledger system, normally operates
pollutant treatment facilities, and ensures that all kinds of pollutants meet the discharge standards
18. Jan. 15,2018, Lishen battery co., ltd. came to our company for supplier audit, and entered the supply
chain system of lishen company in February of the same year, and obtained Grade C supplier qualification.
19. March 15,2018 Generally it takes 20 days to repair the molds, but only 15 days for the inventory.
Anka company made a decision, the whole team assisted the Lishen company to make the molds in 5 and
a half days.
20. April 2018, Anka company upgrades from grade C supplier qualification to grade A supplier. in general ,
this process requires more than half a year of stable supply qualification before the review and upgrade.
21. March 2018 Anka company receives 300,000 yuan of government subsidies (national high-tech subsidies)
22. May 2018 Anka received a subsidy of 80,000 yuan for the provincial patent pilot unit Oct.2018
Anka company passed the discharge project acceptance of the water separation
公司紀事
1. 1.2008年通過(guò)了ISO 9001 2008版 國際品質(zhì)認證。
2.2011年獲得天津市中小型科技企業(yè)認證。
3.2013年10月,安卡公司由天津市北辰區小淀鎮工業(yè)園遷入天津市北辰科技園區。(國家級科技園區)
4.2013年12月,外資轉成內資公司。
5.2014.7月,獲得國家專(zhuān)項立項。
6.2014年獲得頭枕立項補貼30萬(wàn)元,政府提供40萬(wàn)無(wú)息貸款
7.2014年10月,開(kāi)始進(jìn)行Ts16949導入工作。
8.2015年安卡公司開(kāi)始進(jìn)行TS16949的認證準備工作,2015年5月進(jìn)行現場(chǎng)審核,并通過(guò)。
9.2015年9月24天津新三板上市,獲得政府補貼180萬(wàn)元。(實(shí)際補貼60萬(wàn))
10.2015年2月進(jìn)行省級高新技術(shù)企業(yè)申報。
11.2016年6月 獲得天津市專(zhuān)利試點(diǎn)單位
12.2016年10月獲得省級高新技術(shù)企業(yè),同時(shí)進(jìn)行國家級高新技術(shù)企業(yè)申報工作。
13.2016年11月 進(jìn)行5項發(fā)明、六項實(shí)用新型專(zhuān)利申報。
14.2017年3月進(jìn)行設備升級,引進(jìn)4臺 Engel高速注塑機(射速1000)。
15.2017年5月 安卡公司進(jìn)行環(huán)保改造,設備升級。
16.2017年12月 安卡公司獲得國家高新企業(yè)證書(shū) 。
17.2017年12月20日 安卡公司通過(guò)環(huán)境 評估,全面落實(shí)現狀環(huán)境影響評估 報告要求,
嚴格執行有關(guān)環(huán)保法律法規,完善環(huán)境管理臺賬制度,正常運行污染物治理設施,確保各類(lèi) 污染物達標排放。
18.2018年1月15日,力神電池股份有限公司蒞臨我司進(jìn)行供應商認證審核,并在同年2月進(jìn)入力神公司供應鏈系統,
獲得C級供應商資質(zhì) 。
19.2018年3月15日,力神公司供應商模具損壞不能及時(shí)供貨,模具修復需要20天,庫存只有15天。安卡公司做出決策,
上下一致協(xié)助力神公司。結果用了5天半做出了模具,一次送樣合格,并且在第6天達到了量產(chǎn)。第7天達到順產(chǎn)。
20.2018年4月,安卡公司從C級供應商資質(zhì)升級至A級供應商,按照常規,
此過(guò)程一般需要半年以上的穩定供貨資質(zhì)后方可進(jìn)行評審升級。
21.2018年3月 安卡公司獲得30萬(wàn)政府補貼,(國家高新補貼)
22.2018年 5月 安卡獲得省級專(zhuān)利試點(diǎn)單位補貼8萬(wàn)元。
23.2018年10 安卡公司通過(guò)水務(wù)分離的排放工程驗收。